Infrastructure·OPP-000022
Highway Expansion — 38 km Toll Road
Capital Required
$220M project finance
Target Return
12% equity IRR
Querétaro, Mexico
Joint venture for a container terminal expansion at a Panama port. Adds 320,000 TEU annual capacity and a third gantry crane.
Existing terminal serves 1.4M TEU/year with two STS gantry cranes. Expansion adds a third crane, dredging to -16m, and 280m of new quay.
Port operator is the JV GP holding 55%; LP equity tranche of $42M is being placed for 30% of the project.
Pro-forma stabilization (year 3) yields $48M annual revenue at 78% capacity utilization.
Infrastructure engineering and design firm specializing in heavy civil and transportation.
Public documents are available below. Private documents — pitch deck, financial model, contracts — unlock after Atlas Engineering Partners approves your access request.